Approximately 5,700 linear feet of 18in to 27in PVC sanitary sewer pipeline and manholes. The sewer reached depths of up to 35 feet deep and into more than 10 ft of bedrock. Additionally, 400 linear feet of the sewer crossed the Happy Canyon Creek which required a technical approach to dewater, encase the sewer pipe in concrete, and place riprap protection backfill. Where most contractors would flounder in the constant inflow of groundwater and soupy soil conditions, Brannan made this process look easy!