The second project was in the Urban Highway New or Reconstruction category for the Douglas County Southern Connector job. Brannan Sand And Gravel was the Contractor and the Owner Agency was Douglas County. This $1.8 million project consisted of 3 miles of new roadway,...
The project included a 2” mill and overlay, with curb ramp removal and replacement. A total of 10K tons of reinforced SMA, which included a 2K ton test section of reinforced SMA with aramid fibers that was part of an ongoing CDOT study. Brannan Ready-Mix...
Since 2018 Brannan Construction Company has replaced over 47,000 LF of waterline for the Southgate Water and Sanitation District located in Centennial, CO. The work has consisted of installing, connecting, and testing 4-to-16-inch waterlines, fire hydrants,...
Approximately 5,700 linear feet of 18in to 27in PVC sanitary sewer pipeline and manholes. The sewer reached depths of up to 35 feet deep and into more than 10 ft of bedrock. Additionally, 400 linear feet of the sewer crossed the Happy Canyon Creek which required a...
This project consisted of paving 3,245 tons of SMA over the course of one weekend, and closure of the I-25 Managed Lanes. The lanes were shut down Friday night and had to be open to traffic Monday morning. Coordination and planning were critical in completing this...
Construction of a 76,000 seat sports stadium in the middle of Denver is no small task, and shouldn’t be left to just anyone. Contractors would be required to meet accelerated schedules, work under continually changing weather and traffic conditions, adhere to strict...